Building 52
Building 52 Soil Flushing Pilot Test
A new extraction well is being drilled north of Building 7C.
Building 52 Soil Flushing Pilot Test
A new extraction well is being drilled between Buildings 27 and 53.
Building 52 Soil Flushing Pilot Test
Building 53 Groundwater Treatment System
Building 52 Soil Flushing Pilot Test
Building 53 Groundwater Treatment System
Building 64
Building 64 Soil Flushing Pilot Test
Groundwater collection trench has been excavated to 4 feet to expose and remove underground utilities.
Building 64 Soil Flushing Pilot Test
Abandoned electric conduits crossing the site of the groundwater collection trench.
Building 64 Soil Flushing Pilot Test
A 24-inch shaft is being drilled for construction of the groundwater collection trench.
Building 64 Soil Flushing Pilot Test
Construction of injection trench inside Building 64.
Building 7
Building 7 Soil Flushing Pilot Test
The site is being excavated to clear underground utilities for construction of injection wells.
Building 71B
Building 71B Groundwater Treatment System